Pagemagethe libraryWebsite starter
Maker Pricing Workbench digital product cover
Pagemage original / digital downloadv2.49.1
05 editable documentsOffline browser workbookOne-time no subscription

Maker Pricing Workbench / Calculator + Notion import

Handmade product pricing calculator & cost kit

See exactly how labor, packaging, fees, and discounts change the margin on one item before you set a price.

Made for makers and small shops pricing physical products.

Price and availability

Catalog price: $29 USD

One-time purchase · No subscription

  • FilesZIP with five editable Markdown documents, an offline HTML workbook, a reading edition, an HTML calculator, and optional Notion import files (not a configured workspace). A five-document worked case follows one fictional project.
  • To useExtract the ZIP. Open the workbook in a current desktop browser; edit Markdown in a text editor. No account needed for the workbook or Markdown files. A Notion account is needed only for the optional import; set database properties and relations yourself.
  • LicenseUse for your own or client work; do not redistribute the original templates or tools. Full terms.
  • SupportProduct questions and corrections by email; no custom implementation or professional review. 14-day refund policy.
Read the free worksheet

Checking the live price and secure checkout…

The task

What you'll make

A price decision that shows costs, discount effects, and target margin.

Gather before you start

  • Unit materials
  • Labor minutes and rate
  • Actual selling fees

Mark missing information so you can check it before using your work.

When to skip this kit

  • You need a native Excel, Canva, or Word template. This download contains Markdown documents and an offline HTML workbook, plus an HTML calculator, plus Notion import files you configure yourself.
  • You need autosave or cloud sync. Export Markdown or save a backup before closing the offline workbook.
  • You need someone to complete the work. These are worksheets to fill in yourself.

Read the first worksheet below to see whether its questions help with your task.

Included files

What's inside

  1. 01Unit cost worksheet
  2. 02Fee mapping guide
  3. 03Price experiment plan
  4. 04Wholesale readiness review
  5. 05Pricing decision record

The offline calculator shows its formulas and exports your inputs and results as Markdown. The final document includes a common mistake to check for before using your work.

The worked case contains five completed documents, one for each worksheet. Follow the evidence, decisions, and corrections across the same fictional project. The case is included in the workbook, reading edition, Markdown example, and optional Notion import.

Your completion check

Trace the sellable-unit costs to batch records, count labor and overhead once, verify the fee base, and compare the chosen offer with lower-yield and wholesale cases before releasing a price.

Before you finish

Check this before you use it

Markup on cost is confused with margin on revenue.

Use the displayed revenue-based margin and include labor before comparing prices.

Use the final worksheet to record what needs fixing and what you still need to check.

Free worksheet

Start with worksheet one

Free to inspect and copy
WORKSHEET 01 / 05
Download worksheet

Unit cost worksheet

Jump to a section

{{project}} / maker {{business}} / costing version [ ] / review {{deadline}}

Purpose: obtain a traceable cost per sellable unit. Use the same item, batch, currency, and cost period throughout. An unfinished or rejected item is not a sellable unit.

Batch and yield Batch ID/date: [ ]; items started [ ]; sellable units [ ]; rejected or unfinished units [ ]; evidence [ ]. Sellable units must be greater than zero for a per-unit calculation. If none are usable, record the consumed batch costs and investigate yield rather than dividing by zero. A prospective batch may use an explicitly labeled assumed yield; do not present it as observed output. Material input | batch cost | source/date | normal waste included? [Ingredient/component | amount | receipt or explicit estimate | yes/no] Materials per unit = batch material total ÷ sellable units: [ ].

Labor Activity | active batch hours | chosen cost/hour | source | batch cost [Preparation/production/finishing/cleanup/packing | hours | amount | timed record or estimate | hours × rate] Do not double-count overlapping work. State whether the chosen labor cost includes overhead; do not allocate the same overhead again below. Labor per unit = batch labor cost ÷ sellable units: [ ].

Other unit costs Packaging [ ]; absorbed delivery [ ]; other direct cost [ ]. Overhead allocation: [cost period / costs not already in labor / realistic volume / rationale]. Allocated amount per unit [ ]. Low volume or lower yield may raise this allocation; do not divide by a hoped-for future volume to hide it.

Map to calculator.html exactly once Materials per unit → material amount only. Labor per unit → the labor amount above, not Other unit costs. Other unit costs → packaging, absorbed delivery, and separately allocated overhead. Fixed fee per unit → fixed selling fee allocated to the modeled order; see Fee mapping guide. Selling fee (%) → only percentages that apply to the same selling-price base. Target contribution margin (%) → your chosen modeled margin on revenue, not markup on cost. Planned discount (%) and List price to test → the actual offer being compared.

Reconciliation: materials [ ] + labor [ ] + other [ ] = modeled unit costs [ ], before the fixed selling fee. Each expense belongs in one place. If shipping is charged separately or fees apply to tax/shipping, model that order outside this simplified selling-price-only tool.

Adverse case: recalculate using lower sellable yield or a named cost increase. Explain which costs change and why. Export both cases; keep source documents and calculation notes with this worksheet. Ready when: another person can reproduce the field inputs from the batch records without adding labor or overhead twice.

Your decision

How much usable product remains after waste and failed units? My answer: [ ] Source and date: [ ] Still to check: [ ] Next action, owner, and due date: [ ]

Before you start

  • Unit materials: [Source or notes]
  • Labor minutes and rate: [Source or notes]
  • Actual selling fees: [Source or notes]

What you will make

A price decision that shows costs, discount effects, and target margin.

View plain worksheet text
{{project}} / maker {{business}} / costing version [ ] / review {{deadline}}

Purpose: obtain a traceable cost per sellable unit. Use the same item, batch, currency, and cost period throughout. An unfinished or rejected item is not a sellable unit.

Batch and yield
Batch ID/date: [ ]; items started [ ]; sellable units [ ]; rejected or unfinished units [ ]; evidence [ ].
Sellable units must be greater than zero for a per-unit calculation. If none are usable, record the consumed batch costs and investigate yield rather than dividing by zero. A prospective batch may use an explicitly labeled assumed yield; do not present it as observed output.
Material input | batch cost | source/date | normal waste included?
[Ingredient/component | amount | receipt or explicit estimate | yes/no]
Materials per unit = batch material total ÷ sellable units: [ ].

Labor
Activity | active batch hours | chosen cost/hour | source | batch cost
[Preparation/production/finishing/cleanup/packing | hours | amount | timed record or estimate | hours × rate]
Do not double-count overlapping work. State whether the chosen labor cost includes overhead; do not allocate the same overhead again below. Labor per unit = batch labor cost ÷ sellable units: [ ].

Other unit costs
Packaging [ ]; absorbed delivery [ ]; other direct cost [ ].
Overhead allocation: [cost period / costs not already in labor / realistic volume / rationale]. Allocated amount per unit [ ]. Low volume or lower yield may raise this allocation; do not divide by a hoped-for future volume to hide it.

Map to calculator.html exactly once
Materials per unit → material amount only.
Labor per unit → the labor amount above, not Other unit costs.
Other unit costs → packaging, absorbed delivery, and separately allocated overhead.
Fixed fee per unit → fixed selling fee allocated to the modeled order; see Fee mapping guide.
Selling fee (%) → only percentages that apply to the same selling-price base.
Target contribution margin (%) → your chosen modeled margin on revenue, not markup on cost.
Planned discount (%) and List price to test → the actual offer being compared.

Reconciliation: materials [ ] + labor [ ] + other [ ] = modeled unit costs [ ], before the fixed selling fee. Each expense belongs in one place. If shipping is charged separately or fees apply to tax/shipping, model that order outside this simplified selling-price-only tool.

Adverse case: recalculate using lower sellable yield or a named cost increase. Explain which costs change and why. Export both cases; keep source documents and calculation notes with this worksheet.
Ready when: another person can reproduce the field inputs from the batch records without adding labor or overhead twice.

Your decision
How much usable product remains after waste and failed units?
My answer: [ ]
Source and date: [ ]
Still to check: [ ]
Next action, owner, and due date: [ ]

Before you start
- Unit materials: [Source or notes]
- Labor minutes and rate: [Source or notes]
- Actual selling fees: [Source or notes]

What you will make
A price decision that shows costs, discount effects, and target margin.

This is the complete first worksheet from the current edition. The full kit adds the remaining four documents, a worked scenario, and the offline editing workbook, plus an optional Notion import ZIP with Markdown pages and CSV databases.

Worked example

See the worked-case summary

Fictional example included in edition 2.49.1.

Fictional case: Willow Workshop costs a 30-unit candle batch at USD 6 materials, 8 labor, and 4 packaging/allocated overhead per unit. With hypothetical 10% selling fees, a USD 0.30 fixed fee, and a chosen 30% modeled margin, the selling-price floor is USD 30.50. A 10% discount requires a USD 33.89 list price; discounting a USD 32 list price yields only 26.46% modeled margin. Five completed documents show field mapping, fee checks, a bounded offer experiment, an unviable wholesale request, and a sensitivity-based price decision. Rates and observations are fictional.

Before you choose

What should I have ready for this kit?

Bring unit materials, labor minutes and rate, actual selling fees. Mark anything you still need to check.

How do I know the work is finished?

A price decision that shows costs, discount effects, and target margin. Check your answers against the original records and note anything unresolved before sharing your work.

What is in the Notion import pack?

The download includes an optional NOTION-IMPORT.zip with authored Markdown page templates and sample-filled CSV databases. Import the files in Notion, then set field types and any database relations yourself. Alongside those files, you receive editable Markdown documents and an offline HTML workbook, plus an HTML calculator. Set up the imported pages and tables yourself. These are not native Excel, Canva, or Word templates. Extract the whole ZIP before opening the HTML files. Mobile file managers may not run local scripts; the text files and reading edition remain available.

Will this do the work for me?

The calculator models the inputs you provide. Check units, missing costs, and assumptions before using its results. You are responsible for checking the finished work. Custom implementation and professional review are not included.

Included Notion import files · fictional preview data

Maker Product Economics Desk

7 Notion page templates, 1 completed worked-case page and 3 sample-filled CSV databases. Extract the product download, then import NOTION-IMPORT.zip in Notion desktop or web.

04-Unit-Cost-Review.md

# Unit-cost review · [product / variant]
- Exact item, variant, and batch size: [ ]
- Materials per sellable unit and source: [ ]
- Labor steps, minutes, and rate assumption: [ ]
- Packaging and inserts: [ ]
- Allocated overhead and allocation basis: [ ]
- Waste, defect, and return assumption: [ ]
- Currency and date checked: [ ]
- Total rechecked in the pricing calculator: [ ]
- What is excluded: shipping / tax / platform fee / other: [ ]
- Owner and next review date: [ ]

Keep the evidence beside the number. Replace estimates with measured costs only when the measurement method is clear.

01-Product-Cost-Cards · sample database

ProductVariantMaterialsLabor hoursLabor rate assumptionPackagingAllocated overheadTotal unit cost checked?CurrencyReview date
Sample: linen apronNatural / medium9.500.2524.002.000.5018.00USD10/20/2026

Example rows are fictional. The import creates pages and databases; set property types and any relations inside Notion. You configure the tables after import.

Created by Pagemage with AI-assisted writing and development. Read how the content and tools are checked. Questions or corrections: hello@pagemage.tech. 14-day refund policy.